PEG Ultrasonic Testing Pipe

SummaryofPEGultrasonictestingtubeandcontent:acousticdetectiontubePEGutilitymodelcombinesthecharacteristicsofvariouschannels,boththestrengthofthesteelpipe,andplasticpip

Product description

Summary of PEG ultrasonic testing tube and content: acoustic detection tube PEG utility model combines the characteristics of various channels, both the strength of the steel pipe, and plastic pipe corrosion resistance, wear resistance, sealing good advantages, plastic composite layer for seamless structure to ensure the sealing of the entire pipeline, and plastic also has the very high intensity. Because the whole wall thicker, so it is not easy to destroyed by catheter touch into slurry, and between each test tube USES free welding connection, for quick, convenient installation of site construction, as a result of the plastic lighter, makes the same wall thickness of plastic and steel composite pipe of low cost, acoustic detection tube is more economic than existing thick-walled steel pipe and the use of safe and reliable, convenient installation.

 

Construction process:

The testing tube to the principle of reliable convenience, the use of the production of steel before splicing, hanging, after the reinforcement of the link positioning, and steel cage before installation in the bottom of the cage welding positioning (acoustic tube bottom pipe welding positioning buckle), the upper part of the use of wire binding, each 2-3 meters tied together. To ensure the vertical positioning of the detection tube, to facilitate the detection of pile foundation, and prevent concrete pipe collision.

First, the detection tube fixed length

The length of the test tube is the length of the bar cage, the bottom tube should be slightly longer than the bottom cage 20-30 cm

Second, the detection tube bottom cage installs

The detection tube bottom tube is equipped with the movable clamp one, according to the actual construction situation localization, and then welding to the steel cage, in order to hold the inspection tube, prevents floats and rotates

Third, the detection tube cage installation

After the steel Cage is formed, the inspection tube is taken over and the point of the inspection tube is positioned with U-shaped steel bar. Up and down can slide, Jack at one end with S-type rebar hook positioning, when the cage installation, remove the S-type hook, the detection tube slide, insert the bottom tube, and then with hydraulic pliers clamp pressure fixed, the middle of every 2-3 meters with iron wire binding, fixed. So

Detection tube Top CAGE Installation

After installing the top cage of steel bar, the inspection tube is connected to all joints to ensure that the clamp is firmly pressed, the inspection tube must be filled with water, and finally the special head is screwed, all the operation process is complete

Five, the detection tube in the pile is half cage installation test tube can be segmented according to the actual situation welding positioning, easy reinforcement ring hoop positioning, in the absence of steel cage can also be installed, compared with other connecting joints, can save 3 vertical steel bars, and safe and convenient